top of page
Search

NT Lithium Project Update - Significant Pegmatite Intersections Confirmed



HIGHLIGHTS

  • Multiple significant pegmatite intersections observed in numerous drillholes, including: - Drillhole 22RC07 - 27m interval from 16m depth - Drillhole 22RC017 - 19m interval from 69m depth - Drillhole 22RC024 - 15m interval from 49m depth

  • Ongoing RC drilling operations targeting lithium bearing pegmatites

Ragusa Minerals Limited (ASX: RAS) (“Ragusa” or “Company”) is pleased to provide an update on drilling operations at the NT Lithium Project (“Project”) – located in the highly prospective Litchfield Pegmatite Belt in Northern Territory, approximately 120km south of Darwin.


The drilling program is targeting lithium bearing pegmatites beneath the weathering profile – evident at the Core Lithium Project located to the north. The Company has currently completed eight RC drillholes for a total of 719m drilled. Several of these drillholes have intercepted pegmatite of significant thickness at varying depths, providing greater understanding of pegmatite morphology within the project area and assisting with pegmatite delineation.




Click link below to read more...




bottom of page